Heir to the Little Station
8 min read

Chapter 13

Chapter 13 — Heir to the Little Station

Updated 10/08/2026 8 min read

The resort submitted an application to change the direction of the tracks to open the main gate. The new drawing shows the train route bypassing the parking lot, adding four kilometers and a transfer station.

Khoa said the old railway line is located in the most beautiful land. If transferred, the project will still keep the new station and the company can build an overpass.

Mai asked who paid for the operating costs of the extra four kilometers. Khoa said he would negotiate with the railway company.

Tung pointed out that the new route has a high slope, so freight trains cannot travel with enough load. The Faculty requires technical reports, does not accept oral comments.

Mr. Sau Van took the topographic map. He said the person who prepared the file overlooked a weak section of slope. If there is heavy rain, the new tracks will need constant reinforcement.

Khoa doesn't know that. He asked the consultant to correct it, but the application had already been submitted.

Mai looked at the red poles around the station. If there is no objection, the change of direction may be approved before the thirty days have ended.

She sent her comments to the railway department, along with Mr. Sau's independent map. Khoa said she was against his project.

“I'm defending a drawing that doesn't include users,” Mai replied.

Khoa asked her if she really wanted to stay in this area. Mai said she didn't know yet, but knew she didn't want to make a decision by losing someone else's way home.

The change of direction file requires additional safety assessment. Not victory, just more time.

Extra time doesn't reassure anyone. The resort has built a prefabricated office in the north lot, with cars coming in and out every day. The red stake was repainted, this time with a serial number. People passing by saw them and started calling the land by the project name, even though there was no final permit yet.

Khoa sent Mai the complete change of direction documents. He said doing so might make the board of directors unhappy, but he didn't want the group to read the summary written by the communications department. The file has three options: keep the rails, move the rails four hundred meters and move the station to the valley. Each option has costs, but only the rail retention option clearly states the impact on patient and delivery schedules.

Mai invited Tung, Mr. Sau and Lam to look at the drawing. They discovered the new road cuts through a slope of land that geological records only survey in the dry season. Lam said the land could be fine for six months, but no one knows after two rainy seasons. Mr. Sau pointed to the contour line and said the weak slope coincided with the place where he had to rebuild after the flood.

The department called for advice and requested additional surveys in the rainy season. The consultant said it was not necessary because the project was at the approval stage. Faculty asked, if it is not needed, why does the dossier say "preliminary technical conditions are met?" The call ended with an appointment to send a text.

Mai does not want to make Khoa a hero in her profile. She noted the source of his documents and sent questions directly to the railway department. She asked them not only to evaluate the new route, but also to compare the cost of repairing the old bridge. If the plan to change tracks is approved because it is cheaper on paper but requires more maintenance later, the community must know.

A public meeting was held at the station platform. Project representative presented perspective photos. Many people like the new road because of the lights and sidewalks. A mother asked if that way was open all year round. Reply representative will try. She asked if “trying” was a term. They said not yet.

Tung presented the train schedule. If the tracks change direction, the shipment must travel another four kilometers, increasing the time by twenty minutes. If the new slope is high, the ship can only carry half the cargo. People asked if they could combine trucks. Khoa said yes, but there must be a responsible unit when the project road is closed.

Vy showed a chart of days when the road was interrupted. I'm not saying the railway is always better. I just showed that if there are two glands, the risk is reduced; If a line is replaced by an unsigned promise, the risk shifts to the people.

A person who wants to sell land points to the chart and asks when those numbers will turn into money. Vy replied that it won't turn into money right away. But if left unrecorded, money could be promised to a place that doesn't exist. The man did not agree, but did not leave.

After the meeting, Khoa said he was not sure the project would keep its original plan. Mai told him not to stand on the station side; just don't use project power to make the question go away. Khoa asked if she eventually sold the northern land, would she allow the project to pave the way. Mai replied that it is possible, if the road does not intersect the rail corridor and the contract clearly states the operating responsibilities.

The Railway Department sent a written request for additional independent assessment. They didn't say the file was wrong, they just said there wasn't enough evidence. Mai considers it a breathing space. She and her team used their time to build a risk map, without waiting for a decision from above.

Lam marked three landslide points, two sections that needed drainage and a location that could be used as a freight station if the route was kept intact. The Faculty allows the team to survey the project land with prior notification. Mr. Sau reminded everyone to wear reflective vests and not stand near the excavator.

Mai realized the dispute was no longer just about holding a station. It is a negotiation of space: rails, roads, land, water and the user's time. A good drawing can show it all, but only a good process will decide who gets to speak before the road begins to be dug.

At night, Mai wrote in the "unknown things" folder: "Who will maintain the new route after the second year? Who will compensate when revenue is low? Who is responsible for those who do not use tourism services?" She doesn't know when she will get an answer. But the question is already on the table, no longer in the margin cut out of the drawing.

The next day, the project consultant sent a supplement. The weak slope is marked in yellow, but the only solution is to plant trees to prevent erosion and install temporary ditches. Lam said the trees need several years to be effective, and the temporary ditch must be maintained after each rain. Mai asked who was responsible during the period when there were no trees. The records say “management unit”. No name.

The Faculty requires the name of the legal entity and budget. The consulting team said that detail belongs to the construction contract. The Faculty replied that if the application is not known to anyone who manages it, the qualified plan cannot be called. He accepted being criticized for slowing down procedures.

At the station, people want to see the drawings but cannot read the symbols. Vy built a model out of cardboard, using beans to represent flowing water. When the model is tilted, the beans end up in the weak slope area. One child asked why not put the sugar somewhere else. No one laughed at the question. Mai marks the suggestion on the map.

Mr. Sau Van said that in the past, a road project used to build culverts but there were no toilets, and after two rainy seasons, they were clogged. Khoa asked to write down his story. He agreed but asked to clearly state that it was local experience and needed further examination. A young person asked if folk data was taken seriously. Lam says data comes in many forms; The important thing is to know what it answers.

The railway department sent a request for comparison Compare the plan of keeping rails and changing rails in the same model. Mai saw that the model only has construction costs, no delivery costs, time spent going to school or training employees. She filled out an appendix, writing down the columns that were not in the form and the reasons why. The dispatch was returned because it used an external template. Mai sent back both the old form and the appendix, asking them to clearly indicate which part they would not accept.

Khoa said she could be considered deliberately prolonged. Mai says if a template doesn't allow users' expenses to be recorded, the template itself is prolonging the decision by discarding data. He did not argue, just asked for a copy to bring to the board of directors meeting.

A group of young people asked if the project would create jobs for them. Khoa said it was possible, but could not promise the quantity. Mai reminded him to write down the recruitment conditions, term and salary if he wanted to include it in his application. Khoa nodded, then asked Mai if the community chose to sell, would she participate in designing the new station. She said only if the user is involved from the beginning, not after the perspective is complete.

At the end of the day, the red poles around the station were half removed. The rest are survey stakes with clear signs. The small difference makes passersby less confused. Mai records the date of removal, the person who performed it and the reason. The land hasn't changed much, but the language on the land has become more precise.

Vy took a photo of the map after removing the stake, saving both before and after to avoid arguing about location.

Mai writes down the map version number in the corner of the paper.

Faculty confirmed receipt of the new copy.

He sent back a question about the drainage ditch, proving that the map was not just kept in a folder but had been read.

Mai forwards the question to the consultant, sets a deadline for responding and records any cases of unanswered questions in the minutes of the next meeting. No drawing is considered complete just because it has been stamped.

Đã sao chép liên kết chương